Internal wall insulation: for many renovation projects, it is the logical next step, yet it is also the subject that raises the most doubts. In the latest episode of the Interieurbouw & Schrijnwerk podcast, Timo De Mets, R&D Expert at Buildwise, joins the conversation.
The aim of the podcast? To dispel those doubts with a clear message: internal insulation is perfectly feasible. The key? Take a structured approach.
Why internal insulation matters so much today
De Mets puts it in the context of the wider renovation challenge: “If we want to make our buildings more energy efficient and prepare them for the future, we need to look at the entire building envelope. Upgrading roofs and windows is usually straightforward. But façades are more complex: they cover a large area, have a big impact and often come with constraints.”
There are essentially three techniques for insulating façades:
Cavity wall insulation
This involves filling the existing cavity with insulation material. It is relatively straightforward and affordable, but limited by the width of the cavity. In addition, many older homes do not have cavity walls.
External insulation
This involves fitting insulation to the outside of the façade, usually finished with render or cladding. Technically, this is often the most robust solution, but it changes the appearance of the façade and is not always permitted or desirable. Think of protected buildings or sites with limited space.
Internal insulation
This involves fitting insulation to the inside of the façade. It preserves the appearance of the façade, but requires more attention to building physics because it changes how the existing wall dries out.
“Internal insulation is therefore not an exception, but often a necessity,” says De Mets. “And yet, there is still a great deal of hesitation in practice.”
Where does the concern come from?
Hesitation about internal insulation is mainly due to moisture. And that concern is justified, De Mets explains: “When you insulate from the inside, you change how the existing wall dries out. The wall becomes colder and takes longer to dry. Rainwater, which used to be relatively harmless because it could dry out quickly, may remain in the wall for longer. This increases the risk of problems.”
A classic example is the ends of timber joists. Before insulation, these sat in a relatively dry and warmer part of the wall. After internal insulation, they may end up in a colder, damper zone. Without the right precautions, this can lead to deterioration or timber rot.
“But,” De Mets stresses, “that does not mean internal insulation inevitably causes problems. It means you need to approach it with care.”

TV 300: a structured approach instead of guesswork
That is exactly why Buildwise is publishing the new Technical Information Sheet (TV) 300. It provides clear guidance for anyone who wants to use internal insulation safely and on a sound technical basis. The approach consists of three steps.
1. Thorough preliminary investigation
Internal insulation starts not with insulating, but with analysis. Are there existing moisture problems? What condition is the masonry in? Are there timber or metal elements built into the façade? What is its orientation, and how high is the exposure to driving rain?
The aim is not to avoid risks by doing nothing, but to assess them accurately and make them manageable.
2. System selection and sizing
There is no universally ‘best’ system. The right choice depends on the project’s priorities: acoustics, fire safety, environmental impact, loss of internal space, and so on.
Sizing is also important. More insulation is not automatically better. An insulation layer that is too thick can further delay the wall’s drying and increase the risk. TV 300 therefore provides practical guidelines and tables for determining a safe maximum insulation thickness for each situation.
It is not just about the choice of material, but the entire system: fixings, airtightness, any vapour control layers and the internal finish.
3. Attention to construction details
Even the best system will fail if it is poorly installed. Junctions with floors, internal walls and window openings are crucial. If these junctions are not handled correctly, the energy savings may be only a fraction of what is expected. In the worst case, mould problems can develop.
Internal insulation therefore calls for precision, both in the design and on site.
A fully fledged renovation tool
The podcast’s message is clear: internal insulation is not a last resort. It is a fully fledged tool within a wider renovation strategy, provided it is used correctly.
With TV 300, Buildwise’s main aim is to give professionals confidence. Those who understand the principles of building physics, carry out the right preliminary analyses and pay attention to sizing and details can use internal insulation safely and sustainably. No guesswork, then, but evidence-based decisions.