General

From police station to 10 contemporary apartments: functionality and design for a Brussels renovation project

Dit was het eerste project van Grondregie Brussel met vloerverwarming.
Dit was het eerste project van Grondregie Brussel met vloerverwarming.

Transforming a police station for abused children in the heart of Brussels into 10 contemporary homes and a commercial unit. The commission was awarded in 2002 to Brussels architect Walther DeCleyn by Grondregie Stad Brussel.

Today, 20 years later, this splendid renovation in Lombardstraat is complete. Schlüter-Systems also contributed to this remarkable feat of architecture.

“Given its unique location in Brussels, in a UNESCO World Heritage area 100 metres from the Grand Place, I wanted to give the building an exceptional character,” says architect Walther DeCleyn. “Belgian bluestone was the clear choice for the front façade. The lines on the glass balustrades, meanwhile, are a reference to Brussels lace.” The decision was also made to reuse the old concrete structure. To ensure residents’ comfort, all the building services were integrated into a suspended ceiling. This limited the available floor build-up height, while still allowing for a ceiling height of at least 2.50 metres.

This former police station in central Brussels has been converted into an apartment building with 10 homes and a commercial unit.

Individual underfloor heating

As well as solar panels and a Type D ventilation system, the architect wanted to install individual underfloor heating. “To give residents an extra level of comfort,” explains architect Walther DeCleyn. “Schlüter-Bekotec-Therm was an obvious choice: it’s an underfloor heating system I often recommend because of its many advantages. It has a low build-up height, responds quickly and offers a high level of control, allowing several thermostats to be installed in each home.”

Step-free shower

The architect also designed two apartments adapted for residents with disabilities. “Here, too, Schlüter-Systems provided a solution for reliably installing a step-free walk-in shower, along with a range of Schlüter profiles to give the whole space an attractive finish,” says Dimitri Stadsbader of Schlüter-Systems. “I can well imagine that this renovation presented plenty of challenges. I’m pleased we were able to provide straightforward solutions to some of them.”    

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectGeneral
Share this article

Follow on Interieurbouw & Schrijnwerk

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.