Brand-new facility showcases efficiency and Industry 4.0

Power tool and accessory manufacturer Festool is continuing to invest in its German site. Work is under way on a sustainable, modern new building and assembly hall in Weilheim/Teck, in southern Germany, close to the current site of its main production operations. The new project will help meet rising demand for products. This expansion puts Festool in a strong position for further, stable growth.

The pandemic also gave the construction sector a positive boost. At German company Festool, they have seen a marked increase in demand for power tools and accessories. This is why the company is investing in a brand-new building five kilometres from its main production site and right next to its existing logistics centre in Weilheim. On a site of around 10,000 square metres, construction is well under way on a building that will provide the foundation for optimum infrastructure to supply materials flexibly to the assembly area. It will be a model factory for efficiency and Industry 4.0.

An automated guided vehicle system will form the core of this new logistics concept. Six autonomous vehicles equipped with swarm intelligence will transport the required materials from the warehouse to the assembly islands. This approach will sustainably increase productivity and output, while helping to clear the delivery backlogs that have built up over recent months.
Smooth operational changeover
The 12-metre-high, almost 100-metre-long building comprises a large assembly hall and an office area with modern, bright workspaces, meeting rooms of various sizes and a canteen with a kitchen. The use of prefabricated industrial building components ensured high quality in the shell construction and a short build time. The new building meets the latest energy-efficiency standards. A 600 kWp photovoltaic system is installed on the roof of the assembly hall. It generates most of the electricity required on site and helps the new building achieve a demonstrably positive energy balance.


Festool already has a production site in Neidlingen. Once the new building is complete, that site will be modernised. Neidlingen will continue to house machining, tool and equipment manufacturing, the print shop (Print-on-Demand), the training centre for all technical and commercial roles, and the motor competence centre. The assembly lines and 24 assembly islands are moving to the new site. This is a major change, which Festool is managing with the same focus on efficiency. Production began there in December, with around 300 employees.
Question about this story? Ask your question
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- SubjectGeneral
- CompanyFestool



















